contentACCESS documentation – version Orion

  1. Introduction to contentACCESS
    1. Services provided by contentACCESS
    2. Software requirements
      1. contentACCESS prerequisites
  2. contentACCESS setup package
    1. Installation of contentACCESS
      1. EULA
      2. Installation type
      3. Components
      4. Prerequisites
      5. Base folder
      6. Service settings
      7. Database connection
      8. contentACCESS Central Administration
      9. Backup Administration for Microsoft 365
      10. contentACCESS Web Services (Proxy)
      11. contentACCESS Portal
      12. Preview service
      13. Central login
      14. Virtual drive
      15. Search service
      16. Search service (V2)
      17. SMTP server
      18. Overview
      19. Installation
      20. Summary
    2. Update of contentACCESS
      1. Managing the index reset or migration
  3. contentACCESS components
    1. contentACCESS Central Administration
      1. Central administration login
      2. contentACCESS Automated single sign on
      3. Central Administration logout
      4. contentACCESS Central Administration user interface
    2. contentACCESS Portal
      1. Logging in to contentACCESS Portal
      2. contentACCESS Portal Automated single sign on
    3. Backup Administration for Microsoft 365
    4. Virtual drive
    5. contentACCESS Web Services (Proxy)
    6. Central login page
  4. contentACCESS Tools
    1. Installing Outlook forms
    2. Legacy email archive connectors
    3. Legacy archive connector for Metalogix Archive Manager Exchange Edition (MAM EE)
      1. Installing Legacy MAM retrieve service and its configuration on the MAM server
      2. Configuration of the MAM server in contentACCESS Central Administration
    4. Legacy archive connector for Email Lifecycle Manager (ELM)
    5. Installing TECH-ARROW’s WinShortcutter
    6. contentACCESS Outlook add-in
      1. Installation of contentACCESS Outlook add-in
      2. How to use contentACCESS Outlook add-in
  5. Tenants in contentACCESS
    1. How to create a new tenant
      1. How to edit and disable a tenant
    2. Tenant limitations
    3. How to provide access to a tenant (adding new tenant administrators)
    4. Tenant administrator invitation types
    5. Tenant associations
      1. Tenant - database association
      2. Tenant - user association
    6. Tenant deletion
  6. General system configurations
    1. Connection
    2. User interface
    3. Users in contentACCESS
    4. Invitations
    5. Roles
      1. Creating roles
      2. Role details
      3. Role assignment
      4. Defining specific permissions of a role assignment
      5. Editing roles, editing role assignments
      6. Role cloning
      7. General use cases of how to create/assign roles
      8. Managing access to contentACCESS objects
    6. Login providers
      1. Login providers’ context menu options
      2. External login provider configuration
        1. Configuring Google OAuth
        2. Configuring Microsoft 365 login provider
        3. Exchange login provider
        4. External AD login provider
      3. Associating an enabled provider with a user login
      4. contentACCESS users in third party systems
    7. System
    8. Licensing
      1. How to activate your license key
    9. Notifications
    10. System logs — how to find out possible misconfigurations / reasons of potential system/job failures
    11. Configuration auditing
    12. Archive auditing
    13. Distributed environment in contentACCESS — Clusters
    14. Statistics
    15. Legal hold
    16. Task runner
    17. Indexing
    18. SMTP Servers
    19. SMTP Mappings
    20. SMTP Rules - selective journaling
    21. Sharing job
    22. Sharing settings
    23. How to create/configure databases — All databases
  7. Common features
    1. Databases
    2. Schedules
    3. Retentions
    4. Storages
      1. Amazon S3
      2. Wasabi storage
      3. Google drive storage
      4. Datengut storage
      5. Azure storage
      6. Disk storage
      7. HybridStore
      8. Perceptive storage
      9. Kendox storage
    5. Exchange connections
      1. Exchange performance settings – turning off the Exchange throttling policies
      2. Mixed Exchange environments in the Email Archive system
    6. Importing contentACCESS configurations from files
      1. Manual import of Exchange servers/groups/mailboxes to the contentACCESS Address book
      2. Importing File Archive root folders to be archived
  8. Creating new jobs in contentACCESS
  9. Jobs’ page, jobs’ context menu
  10. Filtering in jobs
  11. File Archive
    1. Introduction to File system archive
    2. File archive settings
    3. File archive Databases
    4. File archive System settings
    5. File archive Retentions
    6. File archive Storages
    7. Root folders
    8. Aliases
    9. File archive Schedules
    10. Provisioning settings and managing access to contentACCESS Portal
      1. File system provisioning job description
    11. Remote agents (file archive)
    12. Global rules (remote file archive)
    13. Configuring aliases
    14. Configuration of jobs available in contentACCESS File Archive
    15. Configuration of File archive retention changer job
    16. Configuration of File system archive job
      1. File system archive job description
    17. Configuration of a File system restore job
      1. File system restore job description
    18. Configuration of File system recovery job
      1. File system recovery job description
    19. Configuration of Delete job in File archive
      1. File system delete job description
    20. Configuration of File system shortcut synchronization job
      1. File system shortcut synchronization job description
    21. Configuration of Remote shortcutting job
      1. File system remote shortcutting job description
    22. Active/inactive documents in File system archive
  12. Email Archive
    1. Important settings before creating an Email Archive job
    2. Database settings
    3. Email archive System settings
      1. Hybrid exchange settings
    4. Email archive Provisioning settings
      1. Email archive provisioning job description
    5. Retention settings
    6. Shortcuts in email archiving
    7. Storing of archived emails
      1. LoboDMS storage
    8. Creating email archive schedulers
    9. User experience
      1. Exchange 2013+: contentACCESS MailApp in OWA 2013+ or on MS Outlook 2013+ desktop version
      2. Exchange 2010: OWA 2010 integration
    10. Address book objects
      1. Adding address book objects manually
      2. Removing groups and mailboxes from the Address book
    11. Granting access rights for mailbox users and explicit users to view the mailbox archive
      1. Creating contentACCESS Portal users (option 1)
      2. Manage access to a mailbox archive (option 2)
    12. Database and store assignment in email archiving
      1. How to assign database, storage and index zone to an Exchange group?
      2. How to assign database, storage and index zone to a mailbox?
      3. How to move data from source database/storage into a second (target) database/storage?
    13. contentACCESS MailApp access
    14. Remote agents (email archive)
    15. PST import
      1. PST import job description
    16. Creating Email archive jobs: archive, restore, recovery, delete, mailbox move, shortcut synchronizaion, shortcut repair
    17. Email archive job
      1. Email archive job configuration
      2. Email archive job description
      3. Email archive journal processing
        1. Recommendations after turning on journal archive
      4. Archiving of rights protected messages
    18. Email archive retention changer job
    19. Email restore job
      1. Email restore job configuration
      2. Email restore job description
    20. Email recovery job
      1. Email recovery job configuration
      2. Email recovery job description
    21. Configuration of Delete job in Email archive
      1. Email delete job description
    22. Journal post processing job
      1. Journal post processing job configuration
    23. Mailbox move job
      1. Mailbox move job configration
      2. Mailbox move job description
    24. Shortcut synchronization job
      1. Shortcut synchronization job configuration
      2. Email shortcut synchronization job description
    25. Shortcut repair job
      1. Shortcut repair job configuration
      2. Email shortcut repair job description
    26. Public folder archiving
      1. How to configure a job to archive public folders
      2. Public folders in the contentACCESS Portal archive
      3. User permissions to public folders
      4. Public Folder archiving in mixed Exchange environments
    27. Access to private emails and archiving them
    28. SMTP archiving
  13. SharePoint archive plugin
    1. SharePoint Archive settings
    2. SharePoint archive System settings
    3. Site connections in the SharePoint archive
    4. SharePoint archive Provisioning settings
      1. SharePoint provisioning job description
    5. Shortcut configuration in SharePoint
    6. SharePoint archive Address book
    7. SharePoint Archive job configuration
      1. SharePoint archive job description
    8. SharePoint archive retention changer job configuration
    9. SharePoint recovery job configuration
      1. SharePoint recovery job description
    10. Configuration of Delete job in SharePoint archive
      1. SharePoint delete job description
    11. SharePoint Publishing job
      1. SharePoint publishing job description
    12. SharePoint in the contentACCESS Portal archive
  14. OneDrive archive
    1. OneDrive Archive job configuration
    2. OneDrive archive Jobs
  15. GDPR plugin
    1. GDPR Settings
      1. GDPR Databases
      2. GDPR Schedules
      3. GDPR Index zones
    2. GDPR Processing
      1. GDPR File system settings
      2. GDPR Exchange settings
      3. GDPR Applications
      4. GDPR Jobs
        1. GDPR File system job
          1. GDPR file system job description
        2. GDPR Exchange job
          1. GDPR Exchange job description
        3. GDPR Application job
          1. GDPR application job description
  16. Teams archive
    1. Teams archive databases
    2. Teams archive System settings
    3. Teams archive Provisioning settings
    4. Shortcut configuration in Teams archive
    5. Teams archive Address book
      1. Removing objects from Teams archive Address book
    6. Teams archive Licensing
    7. Teams archive Jobs
      1. Teams archive job
      2. Teams compliance archive job
        1. Comparison between the Teams archive and Teams compliance archive jobs
      3. Teams chat archive job
      4. Teams compliance chat archive job
        1. Comparison between the Teams chat archive and Teams chat compliance archive jobs
      5. Teams archive recovery
        1. Teams recovery job description
      6. Configuration of Teams archive retention changer job
      7. Configuration of Teams chat archive retention changer job
      8. Configuration of Delete job in Teams archive
        1. Teams archive delete job description
      9. Configuration of Delete job in Teams chat archive
  17. Custom plugins
    1. Email management job configuration
    2. Storage replication plugin
    3. Sharing plugin
    4. Datengut plugin
    5. Email synchronizer plugin
    6. Categorize to Public folders plugin
    7. LoboDMS plugin
  18. ThreatTest
    1. ThreatTest configuration
      1. ThreatTest Databases
      2. ThreatTest System settings
      3. ThreatTest Schedules
      4. ThreatTest User experience
      5. ThreatTest Statistics
      6. ThreatTest Job
    2. Using ThreatTest App
  19. officeGATE
  20. contentACCESS Mobile
  21. Virtual drive configurations
  22. Teams application
  23. Application settings
  24. Terms of use
  25. FAQ
    1. Download sample for the file to be imported does not work
    2. Archiving is not working if MAPI is set to communicate with the Exchange server
    3. Virtual drive is still appearing after the uninstall
    4. Outlook forms problems
    5. Unable to open shortcuts of archived files on the server side
    6. Samples are not shown using 'Show sample" option in the Import dialog
    7. Do I need to create separate tenants for file archiving and email archiving
    8. What is the recommended database size for email, file and Sharepoint archiving
    9. The TEMP folder is running out of space when archiving big files
    10. The attachment could not be opened
    11. After updating Exchange 2013, the EWS connection might not work in contentACCESS
    12. If Windows authentication is not working in contentACCESS and an alias was created for contentACCESS
    13. contentACCESS Outlook add-in certificate issue
    14. Prerequisites for Microsoft 365 archiving
    15. PowerShell scripts for setting up Email archive
    16. How to reconfigure your email archive to use modern authentication for PowerShell
    17. Solution for Outlook security patches
    18. Solution for Outlook security patches through GPO
    19. Solution for indexing PDF files
    20. Microsoft 365 SuperUser mailbox configuration
    21. Microsoft 365 journaling
      1. Configuring Microsoft 365 journal forwarding through third-party Exchange Online Protection
    22. Organizational forms
    23. Multifactor authentication
    24. Region setting
    25. contentACCESS MailApp installation issue
    26. Azure app registration for Microsoft 365 archiving
      1. Grant permissions for Email archive
      2. Grant permissions for the OneDrive archive
      3. Grant permissions for the SharePoint archive
      4. Grant permissions for Teams archive
      5. How to request access to Microsoft Protected API
  26. Troubleshooting

11.1.Introduction to File system archive

There are 4 file system job types available in contentACCESS:

1) File system archive job is used to archive documents from the selected location into a selected storage. Archiving can be done in multiple ways. The administrator selects the archiving strategy and decides if the archived file is kept in the file location, replaced by shortcuts or deleted from there. The pictures below show the contents of the original file location before and after the archiving process:

a. With the “Keep original item” method the original file is kept in its original location (recommended archive method for files younger than 1 year):

Documentation217

b. The archived items can be also replaced by a shortcut, thus not taking up so much space on the file-server (disk), yet files are available for use as usual. In this case the “Create shortcut from original item” method should be used. This is the recommended archive method for files older than 1 year and younger than 2 years:

Documentation218

c. The archived item can be also deleted from its current location, in this case the “Delete original” method should be used (recommended archive method for files older than 2 years):

Documentation219

It depends on a typical use case which method is the most advisable to use. Customers use the “Keep” original method with versioning, when they are working on long-term projects and their files are modified too often. E.g. if an architect is working on a project and would like to have a version of it each day, then he may archive the project each day and create versions of it. This protects him from losing his work that he worked on for a longer time (e.g. if a hardware problem occurs). Shortcutting is used by older files that still may be used, so the user would not like to delete them from the file location yet (e.g. files older younger than 2 years). Those items, which are not in use any more – but must be retrievable from the archive during the retention time required by the law – should be deleted from its location when archived. In this case, it is advisable to use the “Delete original item” method.

2) File system restore job is used to restore the already archived items from shortcuts; from the storage (archive) back into the original location.

3) File system recovery may be used to recover deleted items/folders/recursive folder structure if they have been deleted from its original location. It might be very useful if any archived item or folder has been deleted by accident, or if deletion was caused by a technical failure etc. The user may recover either the original file or the shortcut.

4) Remote shortcutting job is a special job type, which can be used with the file archive jobs together. Use this job if you have several remote locations synchronized with your central data center. contentACCESS is installed on the data center, and continuously archives the files already synchronized with the data center. By the synchronization process the files are copied to the data center. So the archiving itself is done by a standard File system archive job; the Remote shortcutting job is used to create shortcuts on the remote locations.

Use this method, if you would like to run the archiving process in a central data center, and replace the remote files with shortcuts if they are not in use. If you have multiple remote shares to archive and you need to speed up the archiving process and save bandwidth, this is the right solution for you.


Editing of already archived files, file versions in File system archive

You can edit an already archived file by opening the original file (if was archived with the Keep original method) or the shortcut to it (LNK, if it was archived with the Shortcutting method) in the original file location or through the Virtual drive.

  • if the file was not shortcutted (i.e. the already archived file is kept in the original file location), then you can open the file in a standard way, edit it and save it. The next archive job will create a version to this file in the archive.
  • if the file is shortcutted (i.e. was archived using shortcuts) and you open the file through the shortcut, you can make changes to the file(s) if you have write access on the file(s) – by simply opening, editing and saving with the associated application. The Virtual drive will detect the change and create a new version from the file(s) after a short delay (about 30 seconds).
  • editing archived files2

    The versioning feature might be very useful for users, who are working on long-term projects and would like to protect themselves from losing their data. In such cases, it is recommended to run an archive job for the project each day, and save the current state (version) of the file/project into the archive.

    cACCESS 2.9 doc 128 cACCESS 2.9 doc 129

    Screenshot A: Versions created when keeping the original item
    Screenshot B: Versions created when using shortcuts

    Synchronization of rights to a file/folder

    The synchronization of user rights to a folder/file in contentACCESS Portal File Archive is managed by the File Archive job. File Archive job writes the file system permissions to the database, and then synchronizes these user permissions in contentACCESS Portal, too. The File archive job synchronizes:

  • the rights to a folder permanently at each job run;
  • the rights to a file only in case that a new version of the respective file has been created.
  • Yes No Suggest edit
    Help Guide Powered by Documentor
    Suggest Edit